As part of a retool, a customer was looking to upgrade their Siemens ET 200x field devices. This legacy hardware was outdated to the point of searching eBay for replacement parts.
The Siemens ET 200pro was specified as the replacement. Patti Engineering completed the programming adjustments and installation.
Aside from solving obsolescence, there were three main benefits to the upgraded field devices:
While this change did have to occur while production was not running in order to replace the hardware, the update went rather smoothly with only a hardware config download and some minor testing. Upfront planning made this possible. During the specification process, the current ET200x components were kept in mind while selecting the new hardware. Each I/O card was individually selected to match the power rating and port numbers to reduce the installation complexity and minimize the conversion and time to the new system.
Michigan Director of Operations
With a natural affinity for control systems integration, Terrance Brinkley has been an asset to Patti Engineering since 2004 and now leads his team as the Director of Michigan Operations. A native of Pontiac, Michigan, Terrance graduated from Michigan State University with a Bachelor of Science degree in both Electrical Engineering and Computer Engineering.Since deciding to join the Ignition certified integrator program and investing in training, our engineers have really grown to like Inductive Automation’s SCADA platform, Ignition....
A customer was having a problem with their Profibus communication. The Profibus nodes were dropping out occasionally. This caused their ovens to stop working and...
A lifetime ago, back in March, we reached out to you all to ask: What can we do to help? The most immediate need we...
Take the first step towards optimizing your business operations and staying ahead of the competition.